SteveWatch+ 1.1
1. New API Loading Engine
Restructured underlying architecture for significantly improved resource loading speed
Faster response, letting you instantly find the content you want to watch
Refreshed player interface
2. Completely Redesigned Player Layout
Upgraded specifications panel with clearer and more intuitive information display
Smoother operation experience
3. Emby Media Library Optimization
Significantly improved interface aesthetics
More fluid and natural browsing experience
Faster operational response
4. Enhanced Stability
Fixed multiple known issues
More stable application performance
Brings a smoother user experience
5. Comprehensive Performance Optimization
Significantly reduced memory usage
Greatly improved response speed
Better overall performance